Total items in cart: (0) Welcome Guest | Login
Bhutanese Artists. Radio Player
Bookmark This Page
AddThis Social Bookmark Button
  Save to del.icio.us
Site News.. Keep up with what's going on! Here's a selection of links to continually updating site info.
¤ Site News ¤ Site Blog ¤ About Us
Quick Links.. ¤ Contact Page ¤ Artist Subscriptions ¤ Advertising ¤ Site Help ¤ Become an Editor
Community Forum
Forum Index | New Topic  » topics

Smelting and charging of electric furnace



qizhenapp
03/13/18 08:32:26
Posts: 4,627
Rabid Fan
Smelting and charging of electric furnace

Requirements for loading: to shorten the time, to ensure the yield of the alloy elements, to reduce the power consumption and to increase the lining of the furnace
Before loading, the batching workers should be carefully proportioning according to the requirements of the planned furnace number and steel type. According to the requirements of different steel technology, the burden should be carefully analyzed and calculated and the ingredients are accurately proportioning. Therefore, it is necessary to confirm the composition and alloy composition of the iron and steel material needed before loading, and check the measuring instruments, so as to ensure the proper chemical composition and accurate weight after melting, so as to facilitate the smooth operation of smelting.Heating Element CIP Graphite RodHigh temperature sintering vacuum furnace
In order to achieve the density, it is necessary to rely on the reasonable collocation of large, medium and small furnace materials. The furnace material is dense, can be obtained once, and can improve the conduction and heat transfer performance of the furnace material. When the electrode is well, the arc is stable and is beneficial to melting. Usually, the charge is less than 10kg is called small material, 10~25kg material is more than 50kg, called aniseed. When loading, the furnace material of different capacity electric furnace has different size requirements, but the maximum of the furnace material must not exceed the 1/50 of the total burden of the furnace.
Superior Quality Induction Heating Furnace Continuous Heat Treatment Furnace
The cloth is more important, generally is part of small material miscellaneous iron installed in the basket bottom, above the small material, the center part of the charging basket loaded aniseed or refractory material, intermediate small fill material, so smooth and non porous, so that is conducive to conductive, and electrode broken bridge and eliminate material to prevent the collapse of material. The rest of the small and medium-sized material installed in refractory material or aniseed on and around. At the end of the material, the heavy load of 0.02%~0.03% was loaded on the upper part of the basket to help the arc, stabilize the current and reduce the radiation damage to the cover of the furnace.double layers anti reflective film automatic coating production line




You must be logged in to post an entry!